Rabbet- A rectangular longitudinal groove cut in the corner edge of
a board or plank.
Radiant heating- A method of heating, usually consisting of a forced
hot water system with pipes placed in the floor, wall, or ceiling. Also
electrically heated panels.
Radiation- Energy transmitted from a heat source to the air around
it. Radiators actually depend more on convection than radiation.
Radon- A naturally-occurring, heavier than air, radioactive gas common
in many parts of the country. Radon gas exposure is associated with
lung cancer. Mitigation measures may involve crawl space and basement venting
and various forms of vapor barriers.
Radon system- A ventilation system beneath the floor of a basement
and/or structural wood floor and designed to fan exhaust radon gas to the
outside of the home
Rafter- Lumber used to support the roof sheeting and roof loads.
Generally, 2 X 10's and 2 X 12's are used. The rafters of a flat roof are
sometimes called roof joists.
Rafter, hip- A rafter that forms the intersection of an external roof
angle.
Rafter, valley- A rafter that forms the intersection of an internal
roof angle. The valley rafter is normally made of double 2-inch-thick members.
Rail- Cross members of panel doors or of a sash. Also, a wall or open
balustrade placed at the edge of a staircase, walkway bridge, or elevated
surface to prevent people from falling off. Any relatively lightweight
horizontal element, especially those found in fences (split rail).
Railroad tie- Black, tar and preservative impregnated, 6" X 8" and
6'-8' long wooden timber that was used to hold railroad track in place. Normally
used as a member of a retaining wall.
Rake- Slope or slanted.
Rake fascia- The vertical face of the sloping end of a roof eave.
Rake siding- The practice of installing lap siding diagonally
Ranch- A single story, one level home.
Ready mixed concrete- Concrete mixed at a plant or in trucks en route
to a job and delivered ready for placement.
Rebar, reinforcing bar-Ribbed steel bars installed in foundation concrete
walls, footers, and poured in place concrete structures designed to strengthen
concrete. Comes in various thickness' and strength grade.
Receptacle- An electrical outlet. A typical household will have
many 120 volt receptacles for plugging in lams and appliances and 240 volt
receptacles for the range, clothes dryer, air conditioners, etc.
Recording fee - A charge for recording the transfer of a property,
paid to a city, county, or other appropriate branch of government.
Redline, red lined prints- Blueprints that reflect changes and that
are marked with red pencil.
Reducer- A fitting with different size openings at either end and
used to go from a larger to a smaller pipe.
Reflective insulation- Sheet material with one or both faces covered
with aluminum foil.
Refrigerant- A substance that remains a gas at low temperatures and
pressure and can be used to transfer heat. Freon is an example and is used
in air conditioning systems.
Register- A grill placed over a heating duct or cold air return.
Reglaze- To replace a broken window.
Relief valve- A device designed to open if it detects excess temperature
or pressure.
Remote- Remote electrical, gas, or water meter digital readouts that
are installed near the front of the home in order for utility companies to
easily read the home owners usage of the service.
Retaining wall- A structure that holds back a slope and prevents erosion.
Retentions- Amounts withheld from progress billings until final and
satisfactory project completion.
R factor or value- A measure of a materials resistance to the passage
of heat. New homewalls are usually insulated with 4" of batt insulation with
an R value of R-13, and a ceiling insulation of R-30.
Ribbon (girt)- Normally a 1 X 4 board let into the studs horizontally
to support the ceiling or second-floor joists.
Ridge- The horizontal line at the junction of the top edges of two
sloping roof surfaces.
Ridge board- The board placed on the ridge of the roof onto which
the upper ends of other rafters are fastened.
Ridge shingles- Shingles used to cover the ridge board.
Rim joist- A joist that runs around the perimeter of the floor joists
and home.
Rise- The vertical distance from the eaves line to the ridge. Also
the vertical distance from stair tread to stair tread (and not to exceed
7 ½").
Riser- Each of the vertical boards closing the spaces between the
treads of stairways.
Riser and panel- The exterior vertical pipe (riser) and metal electric
box (panel) the electrician provides and installs at the "Rough Electric"
stage.
Road base- A aggregate mixture of sand and stone.
Rock 1, 2, 3- When referring to drywall, this means to install drywall
to the walls and ceilings (with nails and screws), and before taping is
performed.
Roll, rolling- To install the floor joists or trusses in their correct
place. (To "roll the floor" means to install the floor joists).
Romex- A name brand of nonmetallic sheathed electrical cable that
is used for indoor wiring.
Roll roofing- Asphalt roofing products manufactured in roll form.
36-inch wide rolls with and 108 square feet of material. Weights are generally
45 to 90 pounds per roll.
Romex- A name brand of nonmetallic sheathed electrical cable that
is used for indoor wiring.
Roof jack- Sleeves that fit around the black plumbing waste vent pipes
at, and are nailed to, the roof sheeting.
Roof joist- The rafters of a flat roof. Lumber used to support the
roof sheeting and roof loads. Generally, 2 X 10's and 2 X 12's are used.
Roof sheathing or sheeting- The wood panels or sheet material fastened
to the roof rafters or trusses on which the shingle or other roof covering
is laid.
Roof valley- The "V" created where two sloping roofs meet.
Rough opening- The horizontal and vertical measurement of a window
or door opening before drywall or siding is installed.
Rough sill- The framing member at the bottom of a rough opening for
a window. It is attached to the cripple studs below the rough opening.
Roughing-in- The initial stage of a plumbing, electrical, heating,
carpentry, and/or other project, when all components that won't be seen after
the second finishing phase are assembled. See also Heat Rough, Plumbing Rough,
and Electrical Rough.
Run, roof - The horizontal distance from the eaves to a point directly
under the ridge. One half the span.
Run, stair- the horizontal distance of a stair tread from the nose
to the riser.
R Value- A measure of insulation. A measure of a materials resistance
to the passage of heat. The higher the R value, the more insulating "power"
it has. For example, typical new home's walls are usually insulated with
4" of batt insulation with an R value of R-13, and a ceiling insulation of